Concrete Footer Pouring Quotes

Get Professional Services

Our Trusted Partners
Beaver Builders

Cost of Concrete Footer Pouring in Broken Arrow

Pouring a concrete footer in Broken Arrow, OK, is a crucial step in many construction projects, providing a stable foundation for structures. The cost of this service can vary depending on several factors, and understanding these can help you budget accurately for your project.

Factors Affecting Cost

  • Size of the Footer: Larger footers require more materials and labor.
  • Depth of Pouring: Deeper footers might need additional excavation and concrete.
  • Soil Conditions: Poor soil conditions can increase preparation and stabilization costs.
  • Accessibility of the Site: Hard-to-reach locations may require special equipment or additional labor.
  • Local Labor Rates: Labor costs can vary based on local demand and availability.
  • Concrete Quality: Higher-grade concrete mixtures can be more expensive.
  • Reinforcement Requirements: Additional materials like rebar can increase costs.

Average Costs for

Task Description Average Cost (Broken Arrow, OK)
Basic Footer Pouring (per linear foot) $10 - $15
Excavation and Site Preparation $500 - $1,500
Concrete Material (per cubic yard) $100 - $150
Reinforcement Materials (rebar) $1 - $2 per linear foot
Labor Costs (per hour) $50 - $75
Total Cost for Standard 100 ft Footer $2,000 - $3,500

Concrete Footer Pouring